The exterior water feature was part of the overall re-positioning of this building, which was once the headquarters for the USDOT.
Rugo fabricated a bright white granite and assembled the water feature with high precision.
Location: Washington, DC
Completion: 2011
Owner: David Nassif Associates
Architect: Smith Group Inc
General Contractor: James G. Davis Construction
Size: 2,000 sqft
Services: Design, fabricate and install granite water feature